Kudos AV
The full arena stage from the back of the room: a 17m LED main screen, two portrait IMAG screens and blue beams from the overhead rig, Andra Traditional 2 at OVO Arena Wembley, LED screens, lighting and sound by Kudos AV.
Kudos AV · Project Journal

Arena Concert · OVO Arena Wembley

Andra: Traditional 2 at OVO Arena Wembley

LED screens, lighting and a d&b arena sound system for Andra’s sold out Traditional 2 concert at OVO Arena Wembley: a 17m main screen, two portrait IMAG screens and a live orchestra mixed for more than 12,500 people.

Venue
OVO Arena Wembley, London
Artist
Andra with Orchestra Frații Advahov
Show
Traditional 2
Audience
12,500+, sold out
Client
Enjoy Events
Role
LED screens, lighting, sound

The story

A Romanian orchestra, a sold out Wembley.

Andra, one of Romania’s best known voices, brought her Traditional 2 concert to OVO Arena Wembley in front of a sold out crowd of more than 12,500. She performed with the Orchestra Frații Advahov and a long list of guest artists in a three hour show that moved from traditional Romanian folk music into pop, rock and hip hop.

Kudos AV supplied the LED screens, the lighting and the arena sound system, and crewed the day from a 06:00 get in to a 03:00 get out: a 17m main screen and two portrait IMAG screens, a d&b audiotechnik J8 and J12 system with full monitor world, and an overhead rig built around a circle truss and a giant X.

Bringing a concert or a large cultural event to Wembley? Talk to us about your arena production.

The film

Traditional 2 at Wembley.

Production scope

Designed. Built. Delivered.

The production disciplines brought together for this project.

01

LED main screen

A 17m x 7m wall of 3.9mm LED across the back of the stage, 4352 x 1792 pixels.

02

IMAG screens

Two portrait 3.5m x 6m LED screens carrying live camera close ups for the whole arena.

03

d&b arena PA

Flown J8 and J12 main hangs, V8 and V12 side hangs, a J-SUB and J-INFRA sub array and Y7P front fills.

04

Monitor world

DiGiCo Quantum 338, 16 d&b M4 wedges and 24 channels of Shure PSM1000 in ear monitoring.

05

Radio mics

14 channels of Shure Axient Digital for Andra and the guest artists.

06

Lighting rig

Circle and X truss design with 115 fixture positions over an 18m stage, plus followspot.

The TRADITIONAL title across the main LED screen with the orchestra on stage and phones raised across the arena floor, Andra Traditional 2 at OVO Arena Wembley, LED, lighting and sound by Kudos AV.
TRADITIONAL on the main screen

The show

An orchestra, a long guest list and one coherent show.

Around 130 people travelled from Romania for the London date, and the show had been in detailed preparation for about six months. Guests reported on the night included Zdob și Zdub, Mioara Velicu, Maria Dragomiroiu, Vlăduța Lupău and Oleg Spinu, each with their own songs, their own look and their own microphone and monitor needs.

That variety is the production challenge. Every guest needs a moment that feels like theirs, while the audience still sees one show. Lighting, screens, sound and stage management all ran to the same running order, so walk ons, mic changes and screen looks landed together.

Andra with violin and accordion at the front of stage, Wembley signage and a full arena behind them, Andra Traditional 2 at OVO Arena Wembley, production by Kudos AV.
Front of stage at Wembley

The venue

Concert production at OVO Arena Wembley.

OVO Arena Wembley, known for years as Wembley Arena and then SSE Arena Wembley, is one of London’s largest indoor venues. Kudos AV has produced in the building before, with Morari Bapu’s nine day Katha built around a 30m wide projection screen. See all of our events at OVO Arena Wembley.

For a touring show the job is to fit an established production into a new building without losing its look or its timing. The screens arrived pixel mapped, the PA was modelled in ArrayCalc and the rig was drawn to the stage, so the day went on building and rehearsing rather than working things out.

Andra in close up across the 17m LED main screen, live camera on both IMAG screens and a fan of blue beams behind, Andra Traditional 2 at OVO Arena Wembley, LED and video by Kudos AV.
Andra on the main screen

LED screens

A 17m main screen and two portrait IMAG screens.

The main screen ran 17m wide and 7m high across the back of the stage: 238 cabinets of 3.9mm LED, mapped as two halves for a combined canvas of 4352 x 1792 pixels. Either side, two portrait IMAG screens of 3.5m x 6m, each 896 x 1536 pixels, carried the live camera close ups so the top tier of the arena could see every expression. In all, 161m² of LED on NovaStar MCTRL4K processing.

Content changed constantly through the night: the TRADITIONAL title, a misty forest, full screen close ups of Andra and her guests. Two video operators ran the screens, with seven video technicians on the build. See more of our LED screen production.

Violin, accordion and the orchestra in traditional Romanian dress in front of a forest scene on the LED wall, Andra Traditional 2 at OVO Arena Wembley, by Kudos AV.
The orchestra and the forest

Sound

Mixing a live orchestra for 12,500 people.

A live orchestra in an arena is a problem of detail, not volume. The PA was a d&b audiotechnik system modelled in ArrayCalc: two flown main hangs of J8 with J12 at the bottom, trimmed at 14m, V8 and V12 side hangs for the wide seating, a sub array of J-SUB and J-INFRA across the front of the stage and Y7P front fills for the first rows. Everything ran on d&b D80 amplifiers through Lake processing, tuned with Smaart.

Front of house and monitors each ran a DiGiCo Quantum 338 with Waves SoundGrid, sharing SD racks on stage. Monitor world covered 16 d&b M4 wedges laid out to the orchestra’s stage plot, 24 channels of Shure PSM1000 in ear monitoring and 14 channels of Shure Axient Digital radio for Andra and the guests, plus a large mic package for violins, accordion, cimbalom, brass and drums. See more of our concert sound.

Andra and a guest singing together at the edge of the stage, gobos across the crowd and haze in the beams, Andra Traditional 2 at OVO Arena Wembley, lit by Kudos AV.
Gobos over the crowd

Lighting

A circle, a giant X and 115 fixture positions.

The rig hung over an 18m wide stage: a circle truss at the centre, four diagonal trusses forming a giant X around it, a row of moving heads along the stage edge and a front truss for key light. The lighting plan numbered 115 fixture positions, enough for beams fanning into the roof, gobos across the audience and a tight special for every guest.

Five lighting technicians built and focused the rig, with a followspot picking out Andra from the back of the arena. See more of our concert lighting.

Behind the build · LED layout

Mapping the screens.

The front elevation of the three screens: a 17m x 7m main screen of 238 cabinets in two halves, seven data runs a side, and two portrait IMAG screens of 3.5m x 6m, each snake cabled in three runs. Every port and every run was mapped before the screens went up.

LED screen layout for Andra Traditional 2 at OVO Arena Wembley: a 17m x 7m main screen of 4352 x 1792 pixels in two halves with seven data runs each, and two portrait 3.5m x 6m IMAG screens of 896 x 1536 pixels, 3.9mm LED on NovaStar MCTRL4K processing, drawn by Kudos AV.
LED screen layout · Kudos AV · Andra: Traditional 2 at OVO Arena WembleyView full-size LED screen layout ↗

Behind the build · Lighting plan

The lighting plan.

The rig from above: a circle truss at the centre, four diagonals forming an X, a back truss, moving heads along the stage edge and a front truss over the audience, across the 18.29m stage. All 115 fixture positions keep their unit numbers from the show plan.

Lighting plan for Andra Traditional 2 at OVO Arena Wembley: a back truss, a circle truss and four diagonal trusses forming an X over an 18.29m stage, a row of moving heads along the stage edge and a front truss over the audience, 115 numbered fixture positions, drawn by Kudos AV.
Lighting plan · Kudos AV · Andra: Traditional 2 at OVO Arena WembleyView full-size lighting plan ↗

Behind the build · Stage plot

The orchestra’s stage plot.

Violins, accordion, cimbalom, double bass, wind and brass on the orchestra riser, drums and accordion on the upper riser, and the front line for Andra and her guests. Each section has its own wedge mix, with monitor world and its cue wedges at the side of the stage.

Stage plot for Andra Traditional 2 at OVO Arena Wembley: violins, accordion, cimbalom, double bass, wind and brass on the orchestra riser, drums and accordion on the upper riser, the front line, 16 wedge positions and monitor world with a DiGiCo Quantum 338, drawn by Kudos AV.
Stage plot · Kudos AV · Andra: Traditional 2 at OVO Arena WembleyView full-size stage plot ↗

The project team

Made together.

LED, lighting and sound
Kudos AV
Artist
Andra with Orchestra Frații Advahov
Client
Enjoy Events

Arena concerts and large cultural events

Planning a show at OVO Arena Wembley?

Project questions

Planning a similar event?

Useful answers based on the production delivered for this project and the way Kudos AV approaches comparable events.

01What did Kudos AV provide for Andra’s Traditional 2 at OVO Arena Wembley?

The LED screens, lighting and sound: a 17m x 7m LED main screen and two portrait 3.5m x 6m IMAG screens, a d&b audiotechnik J8 and J12 arena PA with full monitor world, and a lighting rig of 115 fixture positions, with the crew to build and run it all.

02How big was the LED screen at Wembley?

The main screen was 17m wide and 7m high, 238 cabinets of 3.9mm LED at 4352 x 1792 pixels. With the two portrait IMAG screens either side, the show carried 161m² of LED. See our LED screen production.

03What sound system works for a live orchestra in an arena?

For this show, a d&b audiotechnik system modelled in ArrayCalc: flown J8 and J12 main hangs, V8 and V12 side hangs, a J-SUB and J-INFRA sub array and Y7P front fills, with DiGiCo Quantum 338 consoles at front of house and monitors and Shure PSM1000 in ear monitoring for the musicians.

04Is OVO Arena Wembley the same as Wembley Arena?

Yes. The arena on Engineers Way has been called Wembley Arena, SSE Arena Wembley and now OVO Arena Wembley. It is a separate building from Wembley Stadium. See our events at OVO Arena Wembley.

05Can you work with a touring artist’s own production team?

Yes. Traditional 2 brought a travelling team of around 130 people from Romania. We supplied the screens, sound and lighting to the show’s design and running order and worked alongside their team from get in to get out. Send us your brief.

Planning your event

Event production at OVO Arena Wembley

Planning a concert or large cultural event at OVO Arena Wembley? Start with the show design, the audience plan and the get in and get out times. Share your rider, running order and any touring production so we can plan LED screens, IMAG, arena sound, lighting and crew around them.

More work at this venue

Tell us the venue, date, event format and production you need. We will discuss the brief and prepare a quote.

Discuss your event production

Explore our work by event type

Related

Explore further